The pipes you used...are those normal copper pipes or dit you cover the plastic pipes? I like that authentic look. Looks really cool
About a month after initial fill up I moved across all Livestock. The last stuff to Move was the SPS because I needed to get the chiller plumbed correctly to new tank which the switchover of the chiller could only take place on the day. Plumbing was a bit of a maze but I managed to get it to where I was happy..