So I have started

Joined
12 Mar 2011
Posts
2,489
Reaction score
64
Location
Gauteng
Planned for six months, been going (building for another six months) and prob another six to go.

Glass 30mm starfire

START:
start.jpg


DIGGING:
diggingwheelbarrow.jpg

holefinished.jpg


okedigging.jpg
 
Wow Carlos!
This is going to be so amazing, looking forward to seeing the progression! :thumbup:
 
nice one!
Geothermal cooling and heating
 
So this is the paving / drainage and plumbing. The plumbing is going through the garden, under the foundation wall, throught the paving spare parking etc. through the wall and into the house.
The second part was to put proper drainage into the system and upgrade the current drainage. Had the flow engineers at the house doing he flow metrics and figured out to much standing water during summer rain flow. Low water table will drive water up into the foundation of the sump so had to fix that. As well as hooking up skimmer drainage, water changes, overflows from sump (Some sort of flood), reuse of by product in RO factory.

altatjcubljk9q92cd-wbtvxdojuojehrysx3hwps4xo2bx.jpg


throughwall.jpg


altamx4r3re4rmr-xgb79boavrm0pduywkhxotihuz0iuwh.jpg


altajyonhx7xx4j79mmwinuospqucyw0nnd9cmnhon-7wfl.jpg
 
Back